Pre-award contractor IR & ER risk screening

A contractor can look compliant on paper and still stop your turnaround.

Before you award contractor work, I screen your shortlisted tenderers for the industrial-relations and employee-relations risk that stops jobs on site. You send me the returned tender. Within three business days per contractor you get a one-page assessment, written to drop straight into your evaluation record.

Risk assessment
Shortlisted contractor
Pass with recommendations
Instrument. Award cited by its old name, no classification nominated.
Labour hire. Supply one layer down, licence unverified in a licensing state.
Mobilisation. Crew size within demonstrated capacity.
Evidence appendix · verified against source · 3 business days
25 years IR & ER practice Mining, construction & manufacturing Owner side only, conflict-checked 3 business days per contractor
What it catches

The risks that pass a paperwork check and bite on site.

01

Wrong or expired instruments

Awards named without a classification, or an agreement that no longer applies.

02

Unlicensed labour hire

Supply through an unlicensed arrangement in a state that requires a licence.

03

Hidden subcontract chains

A subcontracting box ticked no while the priced schedule clearly carries one.

04

Crews that cannot mobilise

A workforce the contractor cannot actually attract, employ and get to site.

05

Same job, same pay surprises

Cost exposure on a host enterprise agreement that surfaces after award.

One clear read

Each gap carries a recommendation and a result. Pass, Pass with recommendations, or Fail and refer.

What lands on your desk

One page per contractor. Findings first, evidence behind.

The result and the findings up front, each gap carrying a recommendation. An evidence appendix behind them showing what was checked and against which source. Written to sit in your evaluation record as it is, not to be reworked.

Carrington Workforce RiskRESULT · PASS WITH RECS
Finding 1. Instrument nominated by old title. Recommend the current award and classification be confirmed before award.
Finding 2. Labour-hire licence not evidenced. Recommend the register be checked for the supplying entity.
Finding 3. Crew estimate exceeds demonstrated history. Recommend a mobilisation plan be requested.
Evidence appendix · what was verified, what could not be, and the source for each.
I act for the owner side only, never the tenderers I screen. Independent and conflict-checked for every engagement, so the read is yours alone.
Twenty-five years of industrial and employee relations across mining, construction and manufacturing.
Ryan Carrington, Principal
This is commercial risk screening to inform your procurement decision. It is not legal advice. Where a matter needs a lawyer, the assessment says so and points you there rather than opining.
Engagement

Fixed fee, fast, and the first read is free.

From $1,200
Fixed fee per contractor
3 days
Per contractor from intake
30 min
Walkthrough call included
Free
First read of a shortlist
The first scan is free

Send me your shortlist and the scope.

I will spend twenty minutes on it and tell you which one or two I would look hardest at, and why. That first read is free.

Email Ryan
Award classification tools

Place a role, see the true cost, catch the traps.

A separate set of live award tools for HR, payroll and bookkeeping teams. Place a role on the right level, see the real cost once penalties and casual loading are in, with rates live from the Fair Work pay database.

See the award tools and pricing →

Open the award tools
or try the free rate lookup